Tenant Improvement Projects in Lehi, Utah—Concierge Build-Outs Done Right

You stay in the driver’s seat. We handle the plans, permits, budgets, and the thousands of details between lease and opening day—calmly, clearly, and with meticulous craft.

Serving Lehi & Utah County with a process designed for business owners who want predictable outcomes without losing control.

Open-concept modern living room with floor-to-ceiling glass doors leading to outdoor patio seating.

Why CM Pros for your Lehi tenant improvement?

Client-first, always

You make the calls; we make them easy—presenting clear options, impacts, and timelines at each milestone.

No Hidden Costs Icon

Transparent costs & allowances

We align your TI allowance with a line-item budget and keep you informed as choices evolve.

proactive-communication

Proactive communication

Expect a regular cadence of updates and milestone approvals—no surprises.

Exceptional Craftsmanship Icon

Meticulous craftsmanship

Experienced trades, clean sites, inspector-ready workmanship.

Our Concierge Construction Method (What to Expect)

1. Paid Pre-Construction & Design Agreement

We begin with a focused, paid engagement to de-risk your project: Scope validation, existing conditions review, landlord rules, and a code path tailored to your use. We assemble the permit set (architecture/MEP), confirm utilities and capacities, and pre-coordinate long-lead items so your schedule is protected.

2. Permitting & Approvals (Lehi-Specific)

We package and submit digital plans through the Lehi Building Permit Submittal Portal and coordinate reviews and resubmittals. For fire-related work (sprinklers, alarms, hoods/suppression), we handle the required Fire Prevention Bureau permits. If food or beverage is involved, we coordinate Utah County Health Department plan review requirements so construction can start promptly once approvals are in hand.

3. Detailed Pricing & Schedule

With drawings far enough along for accuracy, we solicit competitive bids, lock in critical suppliers, and present a clear schedule that anticipates inspections. Your TI allowance is integrated, so you can decide where to invest—finish level, lighting, feature millwork, or back-of-house performance.

4. Construction & Inspections

We coordinate trades, protect surrounding tenants, and sequence work to minimize disruptions—night or weekend shifts when feasible. We build to the code requirements for alterations in existing buildings and keep each inspection pass-ready.

5. Turnover, Closeout & Warranty

Before handover, we complete a quality walk, train your team on systems, and deliver O&M documents. You open with confidence; we remain on call.

What we build in Lehi

Office build-outs
Glass fronts, collaboration zones, focus rooms, acoustics, lighting, and low-voltage coordination common to Silicon Slopes offices.

Retail & showroom
Back-of-house storage, dressing rooms, lighting, and power for display systems, accessible counters, and egress checks.

Restaurant & food service
Type I/II hoods, make-up air, grease duct, grease interceptors, washable finishes, health-department plan review, and inspections through final.

Medical/dental
Cleanable finishes, vacuum/suction, and med-gas coordination (with design partners), lead-lining where required, specialized MEP.

Light industrial/warehouse
Mezzanines, racking power drops, HVAC ventilation, lighting redesigns, and office pods.

Warm, modern restaurant interior with wooden floors and ceiling lattice, orange walls, large windows, and hanging cylindrical lights above neatly set dining tables and chairs.

Local permitting & code expertise (Lehi, Utah)

  • Digital plan submittal: All permit applications are submitted through Lehi’s online portal with a complete digital plan set.

  • Inspections: Lehi provides certified inspectors; scheduling and status are managed through Building & Inspections.

  • Fire permits: Certain occupancies, systems, and processes require separate permits through the Fire Prevention Bureau (e.g., fire alarm/sprinkler modifications, hood suppression).

  • Food service plan review: Restaurants require a Utah County Health plan review prior to construction.

  • Existing building code path: We plan alterations under Utah’s adopted existing-building provisions to ensure the right improvements (egress, accessibility, systems) are addressed without over-scoping.

Recent market notes & examples

Corporate office build-outs are common in Lehi’s Silicon Slopes corridor—we design schedules around multi-tenant buildings and shared infrastructure.

Modern conference room with a long meeting table, black mesh chairs, large wall-mounted screen, wood-paneled walls, glass partitions, and potted plants for a touch of greenery.

Real stories from clients who wanted more than just a builder.

What It’s Like to Work with CM Pros​

See for yourself

Nicole Bernard

Gary and Rhonda Call

Portia Edwards

Trusted by the Best in Utah Building & Business

We’re proud to be recognized by organizations that support quality, ethics, and business excellence in construction.

Frequently Asked Questions

Modern conference room with a long meeting table, black mesh chairs, large wall-mounted screen, wood-paneled walls, glass partitions, and potted plants for a touch of greenery.

Yes—Lehi requires permit submittal via the city’s online portal. Separate fire permits may apply, and restaurants require county health plan review. We manage all of it.

Timelines depend on scope, review times, and inspections. Our pre-construction phase shortens overall duration by front-loading decisions and packaging a clean submittal, then coordinating inspections proactively with Lehi.

An amount contributed by the landlord toward your build-out, often structured per square foot. Nationwide, allowances and fit-out costs vary; we align your allowance with a transparent budget so you can prioritize finishes and systems.

Costs vary by market, finish level, systems, and shell condition. National guides show typical office fit-out ranges; some reports note rising build-out averages (e.g., 2024 SLC cost context). We’ll price your specific drawings and scope so there are no assumptions.

We plan phasing, protection, and off-hours work where feasible, and coordinate with building management to minimize noise, dust, and access impacts.

If your new use differs from the prior one (e.g., office to restaurant), additional code items may trigger. We identify those early and incorporate them into your plan set.

Ready when you are

We’ll meet you at your space—or virtually—review your goals, and map a clear, code-ready path to opening day.

Scroll to Top